Bio-rad ChromLab™ Software Manual de usuario Pagina 118

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 178
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 117
5 | Plumbing and Priming the NGC Chromatography Systems
116 | NGC Chromatography Systems and ChromLab Software
To plumb the buffer inlet valves
1. Connect tubing from Outlet A on the buffer blending valve to port 8/BB on
buffer inlet valve A.
2. Connect tubing from Outlet B on the buffer blending valve to port 8/BB on inlet
valve B.
3. Connect tubing from the Out port on inlet valve A to the inlet manifold of system
pump A.
4. Connect tubing from the Out port on inlet valve B to the inlet manifold of
system pump B.
5. (Optional) Connect inlet tubing to ports 2–7 on both buffer inlet valves A and B.
To plumb the sample pump
1. Connect inlet tubing to the sample pump inlet manifold.
2. Immerse the other end of the inlet tubing in a bottle of degassed, deionized
water
.
3. Connect outlet tubing to the Sample Pump port on the sample inject valve.
Vista de pagina 117
1 2 ... 113 114 115 116 117 118 119 120 121 122 123 ... 177 178

Comentarios a estos manuales

Sin comentarios