Bio-rad ProteinChip Qualification and Calibration Kits Manual de usuario Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 35
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
7. The time required to complete this procedure is variable, and it may require up to several
hours as the instrument continually collects data of a specific intensity. If the calibration routine
does not complete, run the procedure again with unused spots.
8. Once the procedure is complete, open ProteinChip data manager software, select the
instrument, and select Instrument > Reinitialize Instrument.
9. The maintenance procedure is complete. Record the operator name and date in the
ProteinChip SELDI OQ form.
11
10010680A.qxp 8/17/2007 1:58 PM Page 11
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 34 35

Comentarios a estos manuales

Sin comentarios